Tag: trail

Monon South Trail Trailhead Public Art Request for Proposals

Radius Indiana is seeking a fabricator to produce six limestone sculptures that can be installed at newly constructed trailheads along the Monon South Trail, which will begin construction during the Summer of 2024.

The limestone sculptures should be ready for delivery and installation by September 30, 2025. Each sculpture should have a theme approved by Radius Indiana and should generally be reflective of some image or element that will be identifiable with the community in which the sculpture will be installed.

The sculptures should be based on one-quarter scale three dimensional models that will be approved by Radius prior to fabrication of the sculptures.

The fabricator should carve/fabricate and arrange the delivery and installation of the sculptures to the six trailhead sites in Mitchell, Orleans, Campbellsburg, Salem, New Pekin, and Borden.

Proposals shall be evaluated based on the following factors:

25%        Use of Indiana Limestone

25%        Presence of the sculptor’s location within the Radius region

(Radius includes Crawford, Daviess, Dubois, Greene, Lawrence, Martin, Orange, and Washington Counties)

25%        Proposed Cost

25%        Suitability of sculpture designs

 

Proposals are requested to be submitted by May 10, 2024. Please submit proposals and/or questions to Jeff Quyle, j.quyle@radiusindiana.com